Sidewalk Installation at Emerson Drive & Towsontown Blvd.
Emerson Drive and Towsontown Boulevard sidewalk installation will begin Monday, October 14. The west side of Emerson Drive will be occupied with contractors vehicles. Two way traffic will continue during the sidewalk installation.
Tags: Sidewalk InstallationCategorised in: General
This post was written by Wettersten, Carol